Projects
Ongoing
AIMS5.0

Artificial Intelligence in Manufacturing leading to Sustainability and Industry5.0 Partially funded by the HORIZON-KDT-JU-2022-2-RIA-Topic-1
Bio-Streams

Multi-Pillar Framework for children Anti-Obesity Behaviour building on an EU Biobank, Micro-Moments and Mobile Recommendation. Partly funded by HORIZON-HLTH-2022-STAYHLTH-01-05 Prevention of obesity throughout the life course
ARCHIMEDES

Trusted lifetime in operation for a circular economy. Partially funded by the HORIZON-KDT-JU-2022-2-RIA-Topic-1
EECONE

European Ecosystem for green Electronics. Partly funded by the HORIZON-KDT-JU-2022-2-RIA-Topic-2
EcoMobility

Intelligent, Safe and secure connected Electrical Mobility solutions: Towards European Green Deal and Seamless
Mobility. Partly funded by HORIZON-KDT-JU-2022-2-RIA-Topic-1
HOSPAITAL

Hospital Transformation through Artificial Intelligence), funded by the EU, CODEVELOP-ICT-HEALTH/0322, 01.01.2023 – 31.12.2024.
A-IQ READY

Artificial Intelligence using Quantum measured Information for realtime distributed systems at the edge), partially funded by the EU, HORIZON-KDT-JU-2021-2- RIA, 01.01.2023 – 31.12.2025
Digitalization by Intelligence for Power Electronic within Value Chains), partially funded by the EU, HORIZON-KDT-JU-2021-IA, 01.01.2023 – 31.12.2025
e-Tawfeer

E-Tawfeer: A Secure Edge-Based Energy Efficiency Platform Using Artificial Intelligence for Behavioural Change, funded by Qatar National Research Fund (QNRF) under the 14th National Priorities Research Programme (NPRP – Collaborative Project). Will start soon.
Edge AI Technologies for Optimized Performance Embedded Processing), partially funded by the EU, HORIZON-KDT-JU-2021-2-RIA-
Airborne data collection on resilient system architectures), partially funded by the EU, H2020 ECSEL 2019, 01.06.2020 – 31.05.2023.
Smart and Sustainable Cities

Smart and Sustainable Cities (SC2), Establishment of a Cross-Domain Research Group for Conducting Research and Development Activities in the Dubai area, partially funded by the Dubai government. Will start soon.
SC4EU

True Demand-Driven Semiconductor Supply Chains for Europe. Partly funded by HORIZON-KDT-JU-2023-03-IA
R3-MYDAS
REmanufacturing, repurposing and recycling energy goods through advanced Mechatronic and Digital technologies, funded By Horizon Europe (HORIZON-CL4-2023-TWIN-
Completed
AfarCloud

Aggregate Farming in the Cloud), partially funded by the EU, H2020 ECSEL 2017, 01.09.2018 – 31.08.2021.
Productive4.0

The aim of Productive 4.0 is to create a user platform across value chains and industries, thus promoting the digital networking of manufacturing companies, production machines and products
EMC2

Embedded Multi-Core Systems for Mixed Criticality Applications in Dynamic and Changeable Real-Time Environments, EU FP7 JTI-CP-ARTEMIS (Joint Technology Initiatives – Collaborative Project). April 1st, 2014 – June 30th, 2017.
FP7/IST E3

(End-to-End Efficiency). Integrated Project. Convergence of high speed networks of fixed – wireless access. Specification, design and development, and evaluation of cognitive wireless networks. January 2008 – December 2009.
EUREKA/CELTIC IMPULSE

EMBIoT

Embedded multi-core systems for multi-critical applications in the Internet of Things Era), funded by Qatar National Research Fund (QNRF) under the 9th National Priorities Research Programme (NPRP – Collaborative Project). November 1st, 2016 – October 31st, 2019.
THELXINOE

Erasmus Mundus Euro-Oceanian Smart City Network. Mobility targeted at research cooperation and know-how exchange with industrialized countries in the field of smart cities. July 15th 2013 – July 15th 2017
IST E2R II

(End-to-End Reconfigurability phase II). Integrated Project. Design and development of reconfigurable (adaptive, cognitive) wireless access infrastructures. Highspeed, wireless-access, infrastructures (B3G). Network segments and terminals capable of selecting the optimal radio access technologies for given contexts. January 2006 – December 2007.
EUREKA/CELTIC WIN-HPN

EM3

Mobile Recommendation Systems for Energy Efficiency, funded by Qatar National Research Fund (QNRF) under the 10th National Priorities Research Programme (NPRP – S, Collaborative Project). April 1st, 2018 – April 1st, 2021.
i-DOHA

Design Requirements: Capability-Driven Requirements Engineering with Application on i-Doha for the 2022 World Cup), funded by Qatar National Research Fund (QNRF) under the 7th National Priorities Research Programme (NPRP – Collaborative Project). March 1st , 2015 – February 28th, 2018.
JMSE

Joint Master in Software Engineering – Tempus IV. Design and development of a joint msc course on software engineering with cooperation with various international Universities. October 15th 2012 – October 14th 2015
IST E2R

(End-to-End Reconfigurability). Integrated Project. Design and development of reconfigurable (adaptive, cognitive) wireless access infrastructures. High-speed, wirelessaccess, infrastructures (B3G). Network segments and terminals capable of selecting the optimal radio access technologies for given contexts. January 2004 – December 2005.
IST ACE

(Antenna Center of Excellence). Network of Excellence. Research on the introduction of smart antennas in high-speed, wireless-access, infrastructures. Network segments and terminals capable of selecting the optimal technologies for handling service area requirements. January 2004 – December 2005 (phase 1) and January 2006 – December 2007 (phase 2).